The store was designed and executed based on a European style guideline, which included architectural and furniture works.
The gallery is two stories high and had to have a stair case demolished and re-built, which was done using iron sections and covered in marble afterwards.
Works also Included but were not limited to; HVAC, Fire Alarm System, Data System, Plumbing (inhouse) , shutter doors, Flooring, Electricity (inhouse), furniture production and installation, and gypsum board cladding.
250
Meter square2 months
DurationOmarat El Oboor
Location